Pipe3” Flex Pipe Ground ConditionsClay, Cobble & Muskeg
Installation Length15742m ROW Width2m - 7m
Crossings26 Common Lines7

 Download Project Details

Cost Savings: Conventional Methods vs TPT

Project Summary

  • Gathering System was completed utilizing Trenchless Pipeline Technology
  • 7 lines in a common ROW maintaining 1.5m cover through clay soils
  • Installation was completed over 21 sections utilizing 7 common entry and exit pits
  • All pipelines were installed in separate holes maintaining 1m spacing

Work Area

  • 7 work areas of 15m x 40m were salvaged of timber, stripped and cleared for project completion
  • 2 sections of 50m were open-cut to avoid additional tie-ins

By the Numbers

  • Scope: Gathering System – well sites and satellite installation
  • Duration: 7 days – not including testing
  • Work Area & ROW Clearing and Salvage: approximately 6,400 sq. meters

Right of Way